Availability
CHRYSLER Camshafts & Valvetrain
Camshafts, Thumpr Hydraulic Flat Tappet, Advertised Duration 295/312, Lift 0.507/0.494, Chrysler, Dodge, Plymouth, Big Block, Each
Part Number: CCA-23-602-5
Not Yet Reviewed
Estimated Ship Date: Apr 13, 2026 if ordered today
Estimated Ship Date: Apr 13, 2026 if ordered today
Timing Chain, CHAIN-TIMING SET (3)
Part Number: MEL-3-3235S
Not Yet Reviewed
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
Valve Springs, Beehive, Single, 1.210 in. O.D., 358 lbs./in. Rate, 1.130 in. Coil Bind Height, Each
Part Number: RSC-PAC-1235
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Valves, Exhaust, Stainless Steel, 1.810 in. Diameter, .341 in. Stem, Mopar, for Performer RPM Heads, Set of 8
Part Number: EDL-9643
Not Yet Reviewed
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Today
Conical Spring, .660" Lift Conical Spring Kit for '09-'18 Dodge 5.7
Part Number: CCA-7230CC-KIT
Not Yet Reviewed
Estimated Ship Date: Apr 13, 2026 if ordered today
Estimated Ship Date: Apr 13, 2026 if ordered today
Camshaft, HRT Stage 3, Street/Strip, 281 int./284 exh. Adv. Duration, 0.632 int./0.609 exh. Lift, 117.5 LSA, Hemi, 6.4L, Dodge, RAM, Jeep, Mopar, Each
Part Number: CCA-201-306-17
Not Yet Reviewed
Estimated Ship Date: Apr 13, 2026 if ordered today
Estimated Ship Date: Apr 13, 2026 if ordered today
Rocker Arms, Pro Series 2024 Billet Aluminum, 1.6 Ratio, Full Roller, Shaft Mount, Self-Locking, with Necessary Hardware, Natural Finish, Kit
Part Number: PQX-3544012
Not Yet Reviewed
Estimated Ship Date: Feb 23, 2026 if ordered today
Estimated Ship Date: Feb 23, 2026 if ordered today
Engine Variable Valve Timing (VVT) Sprocket, Camshaft Phaser
Part Number: RNB-918-707
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Camshaft, Hydraulic Flat Tappet, Advertised Duration 275/287, Lift .525/.525, Chrysler, Each
Part Number: CCA-23-227-4
Estimated Ship Date: Apr 13, 2026 if ordered today
Estimated Ship Date: Apr 13, 2026 if ordered today
Timing Gear Replacement Part, Drill Bushings, Chevy, Chrysler, Dodge, Plymouth, Pair
Part Number: MIL-12569
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Conical Spring, .630" Lift Conical Spring Kit for '09-'18 Dodge 5.7
Part Number: CCA-7228CC-KIT
Not Yet Reviewed
Estimated Ship Date: Apr 13, 2026 if ordered today
Estimated Ship Date: Apr 13, 2026 if ordered today
Timing Chain and Gears, Double Roller, 9 Key Way Crankshaft Sprocket, Dodge, 5.7L Hemi, 6.1L Hemi, Kit
Part Number: MAN-73205
Estimated Ship Date: Apr 6, 2026 if ordered today
Estimated Ship Date: Apr 6, 2026 if ordered today
CONTINENTAL ELITE PRO SERIES TIMING BELT KIT
Part Number: CEL-TB245LK1
Not Yet Reviewed
Estimated Ship Date: Mar 9, 2026 if ordered today
Estimated Ship Date: Mar 9, 2026 if ordered today
Cam/Lifters/Valvetrain, Hydraulic Flat Tappet, Adv. Duration 252/252, Lift .425/.425, Mopar, 273-360, Kit
Part Number: CCA-K20-208-2
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
CAMSHAFT ENGINE
Part Number: MEL-23108
Not Yet Reviewed
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
Camshaft, 3-Bolt, Mechanical Roller, Advertised Duration 288/288, Lift .550/.550, Mopar, Big Block, Each
Part Number: CCA-23-741-9
Not Yet Reviewed
Estimated Ship Date: Apr 13, 2026 if ordered today
Estimated Ship Date: Apr 13, 2026 if ordered today
Rocker Arm Shaft Spacers, Aluminum, 0.062 in. Thick, 0.875 in. I.D., Chrysler, Dodge, Plymouth, Set of 4
Part Number: CSP-SP062K
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Camshaft, Hydraulic Flat Tappet, Advertised Duration 278/282, Lift .410/.412, Chrysler, Small Block, Each
Part Number: MEL-23103
Estimated Ship Date: Today
Estimated Ship Date: Today
Valve, Intake, Titanium, 2.100 in. Diameter, .342 in. Stem, 5.240 in. Length, Universal, Each
Part Number: MAN-11414T-1
Not Yet Reviewed
Estimated Ship Date: Apr 6, 2026 if ordered today
Estimated Ship Date: Apr 6, 2026 if ordered today
Rocker Arm, Shaft Mount, Roller, Aluminum, 1.5 Ratio, Chrysler, Big Block, Left Side, Each
Part Number: PRO-66868L
Estimated Ship Date: Today
Estimated Ship Date: Today
Estimated Ship Date: Today
Camshaft, Hydraulic Roller Tappet, Rattler, Advertised Duration 280/288, Lift .525/.530, Chrysler, Big Block, Each
Part Number: HRS-728005-09
Estimated Ship Date: Apr 13, 2026 if ordered today
Estimated Ship Date: Apr 13, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
COMP Cams Thumpr Retrofit Hydraulic Roller Camshafts 23-600-9
Not Yet Reviewed
Estimated Ship Date: Today
Lifter, Mechanical Flat Tappet, EDM Oiling Hole, AMC, Mopar, V8, Each
Part Number: CCA-2901-1
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Timing Belt Drive System, 2-Piece Upper Pulley Belt Drive, Dry, BB Chrysler +0.250 Raised Cam, Kit
Part Number: JES-KBD-35800
Not Yet Reviewed
Estimated Ship Date: Mar 3, 2026 if ordered today
Estimated Ship Date: Mar 3, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster