Availability
Shock/Strut, Monotube, Polyurethane Bushings, 24.840 in. Extended Length, 14.820 in. Collapsed Length, Each
Part Number: SJA-M9558
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
BUILD IT WITH SUMMIT!
Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SUM-G7770
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
Shock Absorber, Black MAX Series, Black Boot, Rear, Driver/Passenger Side, Dodge, Jeep, Each
Part Number: SJA-B8588
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
Shock/Strut, Hydro 7000, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SJA-H7088
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
Air Compressor, Suspension, Maximum 130 psi, 12 V DC, 18.0 Amps, Each
Part Number: FIP-9284
Estimated Ship Date: Jul 21, 2025 if ordered today
Estimated Ship Date: Jul 21, 2025 if ordered today
Need It Sooner?
We recommend these similar substitute parts:
Shock Adjusting Knob, Replacement, RS9000XL, Each
Part Number: RAN-RS8628
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
Old Man Emu Nitrocharger Plus Strut Front
Part Number: EMU-93009
Not Yet Reviewed
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
Air Compressor, Suspension, Maximum 145 psi, 12 V DC, 17.0 Amps, Kit
Part Number: FIP-2097
Not Yet Reviewed
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
Shock Absorber, B8 5100 Series, Rear, Driver/Passenger Side, Jeep Liberty, Each
Part Number: BSN-24-282659
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
Shock/Strut, Nitro 8000, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SJA-N8088
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
Shock Absorber/Strut Assembly, Quick Strut, Twin-Tube, Gas Charged, Black Boot Included, Each
Part Number: MON-171577R
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
02-07 KJ 2/1.5 Coil Spring Kit
Part Number: BDX-BDS442H
Not Yet Reviewed
Estimated Ship Date: Jul 31, 2025 if ordered today
Estimated Ship Date: Jul 31, 2025 if ordered today
Shock/Strut, B8 5100 Series, Monotube, Gas-charged, Front, Jeep, Each
Part Number: BSN-24-282642
Need It Sooner?
We recommend these similar substitute parts:
Not Yet Reviewed
Estimated Ship Date: Jul 21, 2025
Control Arm, Front Upper, Steel, Natural, Jeep, Each
Part Number: MOG-RK3198
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
Shocks and Struts, B6 4600 Series, Stock Ride Height, Monotube, Gas-charged, Black Boot, Front, Dodge, Jeep, Each
Part Number: BSN-24-139168
Old Man Emu Nitrocharger Plus Shock Rear
Part Number: EMU-63069
Not Yet Reviewed
Estimated Ship Date: Aug 8, 2025 if ordered today
Estimated Ship Date: Aug 8, 2025 if ordered today
Lift Springs, Coil Springs, Front, 375 lbs./in., 1.25 - 1.5 in. Lift, Black Powdercoated, Jeep, Pair
Part Number: EMU-2926
Estimated Ship Date: Aug 11, 2025 if ordered today
Estimated Ship Date: Aug 11, 2025 if ordered today
Shock Absorber/Strut Assembly, Quick Strut, Twin-Tube, Gas Charged, Black Boot Included, Each
Part Number: MON-171577L
Estimated Ship Date: Jul 23, 2025 if ordered today
Estimated Ship Date: Jul 23, 2025 if ordered today
Lift Springs, Front, Black Powdercoated, 2.0 in. Lift, Jeep, Pair
Part Number: BDX-BDS034201
Not Yet Reviewed
Estimated Ship Date: Jul 28, 2025 if ordered today
Estimated Ship Date: Jul 28, 2025 if ordered today
Lift Springs, Rear, Black Powdercoated, 1.5 in. Lift, Jeep, Pair
Part Number: BDX-BDS034205
Not Yet Reviewed
Estimated Ship Date: Jul 28, 2025 if ordered today
Estimated Ship Date: Jul 28, 2025 if ordered today
Air Compressor, Suspension, Maximum 150 psi, 12 V DC, 23.0 Amps, Each
Part Number: FIP-9287
Estimated Ship Date: Jul 17, 2025 if ordered today
Estimated Ship Date: Jul 17, 2025 if ordered today
Shock, NX2 Nitro Series, Twin-tube, Jeep, Rear, Lifted 2.0 in., Each
Part Number: BDX-BDS85968
Not Yet Reviewed
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
Shock, 4600 Series, Monotube, Rear, Dodge, Jeep, Each
Part Number: BSN-24-139175
Estimated Ship Date: Monday 6/30/2025
Estimated Ship Date: Monday 6/30/2025
Strut Assembly, Ultra ReadyMount, Twin-Tube, Gas Charged, Front Diver Side, Dodge, Jeep, Each
Part Number: GAB-G57007
Not Yet Reviewed
Estimated Ship Date: Aug 4, 2025 if ordered today
Estimated Ship Date: Aug 4, 2025 if ordered today
Strut Assembly, Ultra ReadyMount, Twin-Tube, Gas Charged, Front Passenger Side, Dodge, Jeep, Each
Part Number: GAB-G57008
Not Yet Reviewed
Estimated Ship Date: Aug 11, 2025 if ordered today
Estimated Ship Date: Aug 11, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.