Availability
NISSAN PATHFINDER Chassis & Suspension
Shocks and Struts, Summit Racing™ Truck Shocks, Twin-Tube, Red Boot, Front, Chevrolet, GMC, Ford, Mazda,, Each
Part Number: SUM-G7755
Estimated Ship Date: Today
Estimated Ship Date: Today
Shock/Strut, Specialty, Eyelet, Eyelet, Kit
Part Number: ADO-504-562
Estimated Ship Date: Today
Estimated Ship Date: Today
Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SUM-G7742
Estimated Ship Date: Today
Estimated Ship Date: Today
Rebate Expires: 5/31/2026
Shocks and Struts, Nitro Series, Twin-Tube, Red Boot, Front, Dodge, Ford, Mazda, Isuzu, Each
Part Number: SJA-N8052
Estimated Ship Date: Today
Rebate Expires: 5/31/2026
Estimated Ship Date: Today
Bushings, Tie Rod Dust Boots, 19/32 in. Top, 1 3/8 in. Bottom, Round, Red, Pair
Part Number: ENS-9-13101R
Estimated Ship Date: Today
Estimated Ship Date: Today
Shock Absorber / Strut, Excel-G, Twin-Tube, Gas Charged, Each
Part Number: KYB-344045
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Shock, Quick Lift Assembly, Twin-Tube, Coil Spring, Upper Shock Mount, Each
Part Number: RAN-RS999922
Estimated Ship Date: Today
Estimated Ship Date: Today
Cam Bolts, Camber, Caster, Front, for Nissan, Pickup, SUV, Pair
Part Number: SPS-87520
Estimated Ship Date: Today
Estimated Ship Date: Today
Rebate Expires: 5/31/2026
Shock/Strut, Monotube, Polyurethane Bushings, 22.580 in. Extended Length, 13.710 in. Collapsed Length, Each
Part Number: SJA-M9523
Estimated Ship Date: Today
Rebate Expires: 5/31/2026
Estimated Ship Date: Today
Shock/Strut, Strut-Plus, Twin-Tube, Gas Charged, Each
Part Number: KYB-SR4203
Estimated Ship Date: May 4, 2026 if ordered today
Estimated Ship Date: May 4, 2026 if ordered today
Rebate Expires: 5/31/2026
Shock/Strut, Nitro 8000, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SJA-N8054
Estimated Ship Date: Today
Rebate Expires: 5/31/2026
Estimated Ship Date: Today
Shocks and Struts, HiJackers Air Shocks, Stock Ride Height, Adjustable Valving, Air Hose Kit, Rear, for Nissan, Chevy, Isuzu, Mitsubishi, Toyota, Pair
Part Number: GAB-49311
Estimated Ship Date: Today
Estimated Ship Date: Today
Air System Single Automatic Air Command No Gauge
Part Number: FIP-2186
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Shock Absorber / Strut, Gas-a-Just, Monotube, Gas Charged, Each
Part Number: KYB-KG5438
Estimated Ship Date: Today
Estimated Ship Date: Today
Radiator Support Bushings, Rubber, Black, Infiniti, Nissan, Pair
Part Number: RNB-926-281
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Rebate Expires: 5/31/2026
Shock/Strut, Monotube, Polyurethane Bushings, 26.070 in. Extended Length, 15.570 in. Collapsed Length, Each
Part Number: SJA-M9541
Estimated Ship Date: Today
Rebate Expires: 5/31/2026
Estimated Ship Date: Today
Rebate Expires: 5/31/2026
Shock/Strut, Monotube, Polyurethane Bushings, 18.660 in. Extended Length, 11.520 in. Collapsed Length, Each
Part Number: SJA-M9554
Not Yet Reviewed
Estimated Ship Date: Today
Rebate Expires: 5/31/2026
Estimated Ship Date: Today
Sway Bar End Links, Assembly, Heavy-Duty, Front, with Adjustable Steel Ball, M12, 90-115mm, Land Rover, Nissan, Suzuki, 4WD, RWD,
Part Number: WHL-KLC180-090
Not Yet Reviewed
Estimated Ship Date: May 5, 2026 if ordered today
Estimated Ship Date: May 5, 2026 if ordered today
Strut, Loaded, Twin-tube, Black Boot, Each
Part Number: SUM-SA11345
Not Yet Reviewed
Estimated Ship Date: Jun 9, 2026 if ordered today
Estimated Ship Date: Jun 9, 2026 if ordered today
Strut, Loaded, Twin-tube, Black Boot, Each
Part Number: SUM-SA11346
Not Yet Reviewed
Estimated Ship Date: Jun 9, 2026 if ordered today
Estimated Ship Date: Jun 9, 2026 if ordered today
Shocks and Struts, RS5000X Shock Absorbers, Stock Ride Height, Twin-tube, Gas-charged, Red Boot, Rear, for Nissan, Each
Part Number: RAN-RS55391
Estimated Ship Date: May 13, 2026 if ordered today
Estimated Ship Date: May 13, 2026 if ordered today
Strut Assembly, Ultra ReadyMount, Twin-Tube, Gas Charged, Front, Nissan, Each
Part Number: GAB-G57118
Not Yet Reviewed
Estimated Ship Date: Jun 1, 2026 if ordered today
Estimated Ship Date: Jun 1, 2026 if ordered today
Air Compressor, Suspension, Maximum 150 psi, 12 V DC, 23.0 Amps, Each
Part Number: FIP-9287
Estimated Ship Date: Today
Estimated Ship Date: Today
Wheel Alignment Part, Gold, Camber Bolt, for One Wheel, for use on Acura®, for use on Honda®, for Hyundai, Buick, Chevy, GMC, Olds, Ram, Toyota, Each
Part Number: ADO-45K18036
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Lift Springs, Coil Springs, Rear, 390 lbs./in., 1.25 in. Lift, Black Powdercoated, Nissan, Pair
Part Number: EMU-2609
Not Yet Reviewed
Estimated Ship Date: May 28, 2026 if ordered today
Estimated Ship Date: May 28, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster