Availability
JEEP COMANCHE Chassis & Suspension
Showing In Stock Items. Show All 96 Items.
Power Steering Pump, New, Saginaw P Series, w/Reservoir, 3/8 in. Hose Barb Inlet, 5/8 in.-18 Female Inverted Flare Outlet, Keyway, Black, Each
Part Number: LSC-13154
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Power Steering Pump, New, Saginaw Style, Integral Reservoir, 3/8 in. Male Hose Barb Inlet, 5/8 in.-18 Female Inverted Flare Outlet, Chrome Finish,Each
Part Number: LSC-13153
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Power Steering Pump, New, Stock Model, Reservoir, AMC, Buick, Cadillac, Chevy, Chrysler, Dodge, Ford, GMC, Jeep, Oldsmobile, Plymouth, Pontiac, Each
Part Number: LSC-13155
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Steering Stabilizer, 2.0 Performance Series IFP, Clear Anodized, Single, Jeep, Each
Part Number: FRS-985-24-072
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Steering Shaft, Steel, Black, 22.440 in. Length, Power, Jeep, Each
Part Number: CWA-4713943
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Tie Rod Sleeves, Heavy-Duty, Steering Rebuild, Outer Tie Rod Ends, Left Hand Drive, Jeep, Kit
Part Number: RTO-RT21004
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock, 5100 Series, Monotube, Front, Jeep, Each
Part Number: BSN-24-185943
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock, 5100 Series, Monotube, Lifted, Front, Jeep, Each
Part Number: BSN-24-185622
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Steering Box, Power Assist, AMC, Chevy, Buick, Cadillac, Oldsmobile, Pontiac, Each
Part Number: LSC-1353
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock, 5100 Series, Monotube, Lifted, Front, Jeep, 4WD, Each
Part Number: BSN-24-188197
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Steering Box, Replacement, Power Assist, Each
Part Number: AAZ-27-7525
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Tie Rod Assemblies, Steering Linkage, Heavy-Duty, Drag Link Assembly, Right Hand Drive, Jeep, Kit
Part Number: RTO-RT21006
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Power Steering Pump, New, Saginaw, Each
Part Number: LSC-12237
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Helper Spring, E-Z 1000, Black Powdercoated, Kit
Part Number: HEL-1250
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Drag Link, Heavy-Duty, Steel, Black Powdercoated, Raised Ride Height, Replacement Part for Currie System, Jeep
Part Number: RKJ-CE-9701DLO
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock, 2.0 Performance Series, Smooth Body IFP Shock, Jeep, Front, Each
Part Number: FRS-980-24-643
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Ball Joint, Greasable, Front, Upper and Lower, Jeep, Set of 4
Part Number: ROU-10642
Not Yet Reviewed
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
Control Arms, X-Flex, Tubular, Front, Lower, Steel, Black Powdercoated, Jeep, Pair
Part Number: ROU-11900
Not Yet Reviewed
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
Shock, 2.0 Performance Series, Smooth Body IFP Shock, Front, Jeep, Each
Part Number: FRS-985-24-042
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Steering Box, Manual, AMC, Chevy, Buick, Oldsmobile, Pontiac, Jeep, Each
Part Number: LSC-1275
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Power Steering Pump, New, Stock Model, Reservoir, Buick, Cadillac, Chevrolet, Chrysler, Dodge, Ford, GMC, Jeep, Pontiac, Volkswagen, Volvo, Each
Part Number: LSC-12700
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Control Arms, X-Flex, Tubular, Steel, Black, Recommended for Applications with Up To 6.0 in. Suspension Lift, Front Upper, Jeep, Pair
Part Number: ROU-11980
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
Springs, Front Coil, Cargo Control, Jeep, 2.5/2.8/4.0/5.2L, Pair
Part Number: MOG-CC782
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Steering Stabilizer, V2, Single, Stock Ride Height, Brushed Finish, Chevrolet, GMC, Jeep, Each
Part Number: ROU-8731770
Not Yet Reviewed
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
Crown Automotive Control Arms for 1984-2001 CHEROKEE, 1986-1992 COMANCHE, 1997-2006 WRANGLER - CAK12
Crown Automotive Control Arms for 1984-2001 CHEROKEE, 1986-1992 COMANCHE, 1997-2006 WRANGLER - CAK12
Control Arm, Front Upper and Lower, Stock Style, Steel, Black Painted, Jeep, Set of 4
Part Number: CWA-CAK12
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster