Availability
Muscle Car Camshaft, BBM 365HP440, Hydraulic Flat Tappet, 1,500-4,500 RPM Range, Advertised Duration 283/296, Lift .431/.429, Mopar, Each
Part Number: SUM-6421
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, Chevy LS, .010 undersize (thicker), Racing 270 Deg. Oil groove, set
Part Number: SUM-7298HC10
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Gen. V LT, Standard Clearance, 180 or 360 thrust, set
Part Number: SUM-7292HS
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Verticle Links, Rear, 6061 Billet, S550 Mustang 2015-24, Pair
Part Number: SUM-770377
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Piston Rings, Pro GPX Gas Ported, 4.155 in. Bore, File Fit, Gas Nitrided, 0.043 in., 0.043 in., 3.0mm Thickness, V8, Set
Part Number: SUM-GP415543
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Wheel and Tire Assembly, Trailer, Summit 550 series, Rambler tire, 15 x 6, 6 x 5.50 in., Black, ST225/75R15, Load Range E. Each
Part Number: SUM-550A22515DB
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Wheel, Venom, Aluminum, Gloss Black, Polished Lip, Machined Accents, 17 in. x 8 in., 5 x 4.75 in./120.65mm Bolt Circle, 5.50 in. Backspace, Each
Part Number: SUM-149P-786125
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Piston Rings, Pro GPX Gas Ported, 4.500 in. Bore, File Fit, Gas Nitrided, 0.043 in., 1/16 in., 3/16 in. Thickness, V8, Set
Part Number: SUM-GP450046
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Radiator Hoses, Silicone, Blue, Chevy, 5.7L LT, Kit
Part Number: SUM-391216
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Wheel, Fast Five, Aluminum, Polished, 15 in. x 8.0 in., 4 x 4.25 in. Bolt Circle, 5.500 in. Backspace, Each
Part Number: SUM-521P-583427
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Wheel, Off-Road-8, 15 x 8 in., Aluminum, Polished, 3.73 in. Backspace, 5 x 139.7mm Bolt Pattern, Each
Part Number: SUM-56-5885PN19
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Engine Harness, 1967 Chevelle, Small Block V8, With Gauges, Each
Part Number: SUM-RP23207
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Forward Lamp Harness, 1967 Camaro, V/8, Standard With Guages, Each
Part Number: SUM-RP24763
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Piston Rings, Pro GPX Gas Ported, 4.310 in. Bore, File Fit, Plasma-moly, 5/64 in., 5/64 in., 3/16 in. Thickness, V8, Set
Part Number: SUM-GP431064
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Piston Rings, Pro GPX Gas Ported, 4.070 in. Bore, File Fit, Gas Nitrided, 1.2mm, 1.2mm, 3.0mm Thickness, V8, Set
Part Number: SUM-GP407012
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Radiator, Exact Fit, Aluminum, Plastic, Buick, Chevy, GMC, Oldsmobile, Pontiac, Each
Part Number: SUM-380535
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Spindle, Stock Ride Height, Cast Iron, Buick, Chevy, Oldsmobile, Pontiac, Set
Part Number: SUM-CSUM77M700
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Heater Cores, Classic OEM, Copper/Brass, Natural, Buick, Cadillac, Oldsmobile, Each
Part Number: SUM-382216
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Gauges, Speedometer Gauge, Direct Replacement, Analog, Mechanical, 0 - 90 MPH, Black Face, White Numbers, White Pointer, Chevrolet, GMC, Each
Part Number: SUM-RP22045
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
1972 Nova, 1972 GTO, Engine Harness, V8, Without Gauges, Manual Trans requires T.C.S Extension, Restoration, Chevrolet, Each
Part Number: SUM-RP20602
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Engine Harness,HEI, With Warning Lights,Big Block, Restoration, Chevy, Each
Part Number: SUM-RP20649
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Engine Harness, 1970 Chevy II / Nova, V8, Auto Trans, Each
Part Number: SUM-RP23215
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Forward Lamp Harness, 1964 Cutlass, V8, Each
Part Number: SUM-RP23691
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Wiring Harness, Engine Harness, 1968 GTO, V8, With Ram Air, Each
Part Number: SUM-RP22409
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Wheel and Tire Assembly, Trailer, Summit 550 series, Rambler tire, 15 x 5, 5 x 4.50 in., Black, ST205/75R15, Load Range D. Each
Part Number: SUM-550A20515DB
Not Yet Reviewed
Estimated Ship Date: Monday 12/1/2025
Estimated Ship Date: Monday 12/1/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.